Jobiglo

No results.

Unlock this candidate profile

Sign up free as a recruiter to view the full CV, contact info and reach out to this candidate.

?

20 years of experience

Skills

Strategic Business Planning Operations & Production Management Supply Chain Management Capacity & Resource Planning Cost Reduction & Budget Optimization Process Improvement Lean Manufacturing ISO 9001 Auditing ISO 45001 Auditing ERP Oracle Applications Cross‑Functional Leadership Master Production Scheduling (MPS) Material Requirements Planning (MRP) Risk Management

Experience

Planning Manager

NARDI ELECTRONICS

2026-01 -

Lead strategic master production scheduling (MPS) and material requirements planning (MRP) to maintain optimal inventory and seamless electronics production. Coordinate end‑to‑end supply‑chain activities with procurement and logistics, eliminating bottlenecks and reducing lead times. Define and monitor key performance indicators (KPIs) for the planning department, improving forecasting accuracy and operational efficiency.

Deputy Director General

MO SO COMPANY

2025-01 - 2026-12

Directed daily operations and corporate planning strategies across multiple departments, ensuring alignment with executive business goals. Spearheaded process‑optimization initiatives that increased overall productivity and improved resource allocation. Managed risk‑assessment frameworks to safeguard production continuity and operational efficiency.

Operations Manager – Refrigerator Factory

UNIONAIRE GROUP

2023-01 - 2025-12

Managed full‑scale plant operations, production schedules and workforce allocation for a high‑volume refrigerator manufacturing facility. Implemented cost‑control strategies that reduced manufacturing waste and optimized OPEX. Ensured strict compliance with safety standards and quality‑control protocols across all assembly lines.

Planning Manager – Television Factory

SUNNY EGYPT

2009-01 - 2023-12

Oversaw long‑term and short‑term production planning for the TV manufacturing division, achieving 100 % on‑time delivery. Utilised Oracle Applications to enhance supply‑chain visibility, data tracking and material management. Collaborated with R&D and engineering teams to integrate new product introductions (NPI) into active production lines.

Production & Planning Engineer – Water Purification Units Factory

UNIONAIRE TECHNOLOGY

2007-01 - 2009-12

Developed daily and weekly production schedules, balancing machinery capacity with market demand. Analysed production data to identify variances and implemented corrective actions to maximise throughput. Contributed to continuous improvement projects that reduced cycle times.

Production Engineer – Indoor Air Conditioning Units

UNIONAIRE GROUP

2003-01 - 2007-12

Supervised floor‑level assembly processes, ensuring production targets met strict quality and volume benchmarks. Participated in cross‑functional task forces aimed at minimising equipment downtime and improving overall equipment effectiveness (OEE). Provided technical support for process adjustments and line balancing.

Education

B.Sc. in Aerospace Engineering, Cairo University (2001)

Languages

Arabic

fluent

English

fluent

Contact candidate

Last updated: 2 months ago