Jobiglo

No results.

This job is no longer available

This job expired on 27/10/2026. It no longer accepts applications.

Site Manager – Data Center Construction

ByteBridge · RAS Hong Kong

Onsite Senior 🇬🇧 English
MEP installation Construction management

Job description

About the role

We are looking for an experienced Site Manager to lead on‑site construction execution for a high‑profile data centre project in Tseung Kwan O, Hong Kong. The role is fully based on‑site and requires daily oversight of all construction activities, contractor coordination and strict compliance with quality, safety and data‑centre standards.

Key responsibilities

  • Stationed daily at the project site to manage and monitor construction activities, contractor workmanship, site logistics and installation quality against approved drawings and specifications.
  • Supervise main contractors, MEP subcontractors and vendors; conduct daily toolbox talks and coordination meetings to resolve spatial clashes and trade interferences.
  • Enforce quality control on incoming materials and workmanship; oversee inspection points, factory/site acceptance tests (FAT/SAT) and Level 1‑5 commissioning support.
  • Implement and uphold Environment, Health and Safety (EHS) policies and Hong Kong safety regulations, maintaining a zero‑incident safety culture.
  • Track critical paths, identify delay risks, implement mitigation plans and manage site instructions or change requests affecting budget or schedule.
  • Act as the primary on‑site liaison between Project Managers, Engineers, Client Representatives and Hong Kong statutory bodies/utilities.

Required profile

  • Diploma or degree in Building Services Engineering, Electrical/Mechanical Engineering, Construction Management or a related discipline.
  • 5 + years of on‑site construction management experience, including at least 3 years on data‑centre or mission‑critical facilities.
  • Valid Hong Kong safety credentials (e.g., TCP1, Green Card, Registered Safety Officer) preferred.
  • Fluent in English, Cantonese and Mandarin.
  • Strong problem‑solving ability, high stress tolerance and hands‑on leadership in a dynamic site environment.

Required skills

  • MEP installation and testing workflows.
  • Factory/site acceptance testing (FAT/SAT).
  • Level 1‑5 commissioning support.
  • Compliance with Hong Kong safety regulations and EHS standards.
  • Construction management of data‑centre projects.

Questions fréquentes

Le salaire n'est pas communiqué publiquement par le recruteur. Vous pouvez postuler et négocier directement avec ByteBridge.
Cliquez sur "Postuler maintenant" en haut de la page. Vous pouvez importer votre CV en 1 clic — Jobiglo extrait automatiquement vos informations et postule pour vous.

Why are you reporting this job?

Thank you for your report. We will review this job.

Explore further

Salaries, guides and searches in Hong Kong.

A question about this job?

Ask it here: you will get the full job summary by e-mail, right away.

Published 2 months ago

32 views · 0 interested

Boost your chances

Upload your CV — we will match you with relevant openings.

Analyzing your CV...

ByteBridge

RAS Hong Kong